Skip to content

GLOB-EL / INSTALLATION SYSTEM

Installation boxes

Built around the project.

Applications

Start with the project, not the product.

Every project type asks a different question before a flush-mounted installation box model is chosen. Tell us which one you are working in and we will take you straight to the models used there and confirm the fit for your market before you order.

Working in more than one of these, or not sure which applies? Send your project type and target market and we will confirm before you order.

Start a market-fit review
ETM420P flush-mounted Perilex socket ETM422P surface-mounted Perilex socket ETM421S rewirable Perilex plug ETM277S Perilex cord set

New · Perilex

Perilex sockets, plugs & cord sets

Five-pin cooker connectors, 16 A 230/400 V~, for electrical wholesalers and private-label brands. An extra source you can qualify now.

  • 01Built to DIN 49445 / 49446 — sockets, plugs and cord sets
  • 02Certified per model: SS 428 08 34 (SE) · NEN 1020-1 (NL) · NEK 502 (NO) · DIN VDE 0620 (DE)
  • 0350,000 pcs per month, standard lead time 5–6 weeks

Before you order

We do not tell you it fits. We check.

Installation boxes — known as the back box, socket box, switch box or device box depending on the market — are among the least standardised products in electrical installation. Installation practice, device systems, conduit conventions and the boxes already in use differ from country to country, from the UK and Ireland to Germany, the Netherlands, Denmark, Poland, the Czech Republic and the Nordics. So we review the dimensions, the fixing method and the conduit entries against your actual situation, and give you one of three answers: it fits, it fits with a defined limitation, or it does not fit and here is why.

Start a market-fit review

Documents by model

Datasheets and drawings are issued per model. Where a document is published it is linked from the model page; where it is not, request it and we will send the current version.

Technical resources

Compliance, stated per model and market

We do not publish blanket compliance statements across the range. Tell us the model and the destination market and we will tell you exactly what exists.

Compliance and documents

Data your distributor can use

Product data prepared in the structure your distributor needs, including ETIM-classified data where required.

Distributor support
Glob-el electrical manufacturing facility and production site

35+ Years of Electrical Manufacturing Experience

OEM / Private label

Your brand, our production line

Many of the best product ideas in electrical installation come from people who work in the market every day, wholesalers, brand owners and installers who know exactly what the local range is missing. What they usually do not have is tooling, material selection, production and the documentation chain behind it. That is the part we do.

01

Private label

An existing model under your brand. Packaging, labelling, instruction sheets, barcoding and carton marking to your specification.

02

ODM development

A box designed or adapted for your market: local installation practice study, structural assessment, drawings, sampling, tooling, testing and production.

03

Channel data support

We supply the product information your distributor needs to apply for the national electrical product number in your market, and product data in the structure their system expects. The number itself is issued through the national system and your wholesaler, not by us.

Request a quote

Send the project, not just the part number

Target market, project type, models, quantity, packaging and the documents you need. Attachments help: a drawing, a photo of the box you are replacing, or a project position list will usually get you a more precise answer, and a faster one.

  • A model list matched to your project type and market
  • Pricing based on your model, quantity, packaging and destination
  • The documents that exist for those models, issued per model
  • Packaging, labelling and call-off agreed for your delivery process
Hong Kong International Lighting Fair (Autumn Edition) 27–30 OCT 2026 5C-D30