Applications
Choose the installation context first.
A wall box is specified by the environment around it. Start with the project path, then move to the wall construction and model evidence that the job requires.

Project paths
Four environments. One clear starting point.
Each route carries a different installation question into the model review.

Residential
Residential electrical installation
Timber frame, board and masonry work where wall build-up and device fit decide the box.
Open application
Commercial
Commercial and office buildings
Repeatable positions across offices, education, hospitality and public buildings.
Open application
Precast
Precast concrete plants
Formwork, reinforcement and conduit entry reviewed before a box is cast into the element.
Open application
Prefab
Prefab and modular housing
Factory pre-installation where repeatability, handling and packaging support the line.
Open applicationSelection logic
Context keeps the shortlist honest.
Use the application page to define the construction condition and project workflow. Use the product page to verify the exact model record, document status and RFQ context.
- Construction
- Wall build-up, fixing method and conduit entry.
- Project
- Repeatable positions, line handling or casting sequence.
- Evidence
- Exact model, verified descriptor and available document.
Project handoff
Bring the wall condition into the enquiry.
Share the target market, construction, device system and model reference when known.